Workplan 2014

Work Plan for 2014

Ongoing activities

  • Documentation of physics lists(~All)
  • Release, candidate and reference tag testing for physics performance on Grid (Alberto, George, Witold)
  • Physics Validation and Grid (Kihyeon, Soonwook, Sang Wan)

Development Items

  • Documentation of physics lists (Kelsey,Yarba, ...)
    • Borrow from Dennis' tutorial presentation, pull into App Guide
      • Documentation link talk from Dennis (just for reference):

Workplan 2015

Work Plan for 2015

Ongoing activities

  • Documentation of physics lists(~All)
  • Release, candidate and reference tag testing for physics performance on Grid (Alberto, George, Witold)
  • Physics Validation and Grid (Kihyeon, Soonwook, Sang Wan)

Development Items

  • Physics lists factories
    • Resolve issues with new user extensible factory G4alt::G4PhysListFactory (Robert H.)
    • Evaulate merging existing factory G4GenericPhysicsList and new G4alt::G4PhysListFactory (Robert H.)
      • F

Visworkplan 20090213

To Do List as of 13 February 2009.

As is standard for Geant4 Planned Features documents,

(1) means expected to be done in first half of year

(2) means expected to be done in second half of year

(2/*) means may get to this in second half of year or maytake longer

Visworkplan 20110225A

As is standard for Geant4 Planned Features documents,

(1) means expected to be done in first half of year

(2) means expected to be done in second half of year

(*) means may get to this in second half of year or may takelonger

Update DAWN to work on latest versions of Windows - (1)Satoshi

-

Visworkplan 20100210

Work Plan as of 10 February 2010.

As is standard for Geant4 Planned Features documents,

(1) means expected to be done in first half of year

(2) means expected to be done in second half of year

(2/*) means may get to this in second half of year or maytake longer

Visworkplan 20130227A

As is standard for Geant4 Planned Features documents,

(1) means expected to be done in first half of year

(2) means expected to be done in second half of year

(*) means may get to this in second half of year or may take longer

Qt5: Adapt as necessary for this new Qt version (1)

-

Visworkplan 20120223B

As is standard for Geant4 Planned Features documents,

(1) means expected to be done in first half of year

(2) means expected to be done in second half of year

(*) means may get to this in second half of year or may take longer

Qt: Show geometry hierarchy of touchables including buttons to control visibility - (1)

Visworkplan 20160229

As is standard for Geant4 Planned Features documents,

(1) means expected to be done in first half of year

(2) means expected to be done in second half of year

(*) means may get to this in second half of year or may take longer

Multi-threading: Support user-drawn primitives in MT mode (*)

-