Tsld013

  • Any action which requires re-build of physics tables must be prohibited during “event-loop”.

  • Even if such actions are executed outside of “event-loop”, re-initialization must be executed before the next “event-loop” (i.e. next RUN)

  • Process, material and particle classes need to

    • watch “ApplicationStatus”
    • enable/disable their methods properly
    • inform “ApplicationStatus” change to G4StateManager

Previous slide Next slide Back to first slide View graphic version